Pool permits in Belleville, IL

The City of Belleville Health, Housing & Building Department reviews and issues the building permit for a residential pool and does the inspections. Under city code the Building Official also enforces zoning, so one office handles both.

Permit from
City of Belleville
Permit fee
$100
Pool fence
4 ft minimum

Permits an inground pool needs in Belleville

Pool fence and barrier rules in Belleville

Pool permit fees in Belleville

$100 building permit fee for installing a swimming pool (City Code § 150.32(J)). Fees must be paid before the permit is issued. Starting work without a permit doubles the fee (§ 150.32(H)).

How far a pool must be from property lines

No swimming pool may be in a front yard (City Code § 162.398(A)). Side and rear setbacks for pools were not found.

Inspections

  1. Per the building permit application, notify the inspector before pouring footings, at foundation before backfill, at rough framing, and at final. Pool-specific inspection steps are not published.

Other things to know before you dig

Codes in use

2006 International Building Code and 2006 International Residential Code (City Code § 150.01); 2014 National Electrical Code with amendments, per the department page. The city's posted pool regulations handout reproduces 2006 IBC Section 3109 (pool enclosures). No adoption of the ISPSC was found.

Who to contact

Sources

Checked against these official sources in October 2026. Rules and fees change, so confirm with the permit office before you sign a contract or break ground.

Get a pool quote in Belleville

A local builder handles the permit, inspections and barrier details as part of the job. See what a pool costs in Belleville.

Get matched with a local pool builder

Pool permits nearby in St. Clair County