Pool permits in Edwardsville, IL

The City of Edwardsville Department of Public Works handles the whole job: the swimming pool permit, the required fence permit, zoning approval, the electrical inspection, and the other pool inspections. The Fire Department signs off only if a reduced setback from the house is requested.

Permit from
City of Edwardsville
Permit fee
$100 + $20 electrical, $30 fence, $2,500 bond
Pool fence
4 to 6 ft

Permits an inground pool needs in Edwardsville

Pool fence and barrier rules in Edwardsville

Pool permit fees in Edwardsville

Swimming pool permit $100.00, plus $20.00 for the electrical permit (fee chart, current as of 5/1/25). Fence permit $30.00. Re-inspection $25.00. A $2,500 one-year surety bond is also required. Fees are paid on approval or when the permit is picked up.

How far a pool must be from property lines

No pools in a front yard. At least 5 feet from side and rear property lines; at least 10 feet from the street-side line on a corner lot. At least 10 feet from the house; this can drop to 5 feet if the Fire Chief finds no effect on bedroom-window or exterior-door emergency exits. At least 10 feet from anything higher than the pool wall, such as a balcony, raised deck or accessory structure. Pool houses and sheds: 5 feet from side and rear lot lines and 10 feet from the pool. Up to 18 feet of clearance in any direction, plus 10 feet horizontally, may be required from overhead electric lines. No accessory structure or fence may be built in an easement.

Inspections

  1. Pre-permit job site coordination meeting (property lines and easements staked; pool and fence locations marked)
  2. Erosion control inspection before excavation
  3. Footing inspection (listed in the Q&A booklet)
  4. Electrical bonding and underground electrical
  5. Electrical final (access to the electrical service required)
  6. Fence final (property lines and easements staked)
  7. Final inspection of the pool, fencing and all equipment before anyone swims

Other things to know before you dig

Codes in use

2021 International Building Code and 2021 International Residential Code (with amendments), adopted January 2023; 2020 National Electrical Code (with amendments); Illinois State Plumbing Code. The city's code list does not include the ISPSC.

Who to contact

Sources

Checked against these official sources in October 2026. Rules and fees change, so confirm with the permit office before you sign a contract or break ground.

Get a pool quote in Edwardsville

A local builder handles the permit, inspections and barrier details as part of the job. See what a pool costs in Edwardsville.

Get matched with a local pool builder