Pool permits in Wildwood, MO

The City of Wildwood Planning Department issues a Zoning Authorization that checks the pool's location against setbacks. St. Louis County then issues the building permit and does plan review and inspections under contract with the city.

Permit from
St. Louis County, after city zoning approval
Permit fee
County fee table by project cost, plus $47
Pool fence
48 in. minimum

Permits an inground pool needs in Wildwood

Pool fence and barrier rules in Wildwood

Pool permit fees in Wildwood

St. Louis County charges by estimated construction cost (SLCRO Table 1100.060, which covers residential swimming pools), plus a $47 permit processing fee. Examples from the table: $284 up to $50,000, $366 up to $70,000, $500 up to $100,000, $704 up to $150,000. Each additional inspection is $47. No Wildwood Zoning Authorization fee was found.

How far a pool must be from property lines

The pool and its mechanical equipment (pump, heater, etc.) must meet the minimum structure setbacks of the property's zoning district, and so must the concrete decking of an in-ground pool. Pool equipment in a side yard must be screened against noise and visual impact on neighbors. No structure may sit in the minimum setback area.

Other things to know before you dig

Codes in use

St. Louis County Building Code (SLCRO Ch. 1115) and Swimming Pool and Spa Code (SLCRO Ch. 1118, the 2015 ISPSC with county amendments), adopted by Wildwood City Code Section 500.020.

Who to contact

Sources

Checked against these official sources in October 2026. Rules and fees change, so confirm with the permit office before you sign a contract or break ground.

Get a pool quote in Wildwood

A local builder handles the permit, inspections and barrier details as part of the job. See what a pool costs in Wildwood.

Get matched with a local pool builder

Pool permits nearby in St. Louis County